In our continuing
efforts to maintain a safe and dependable utility service, it is
necessary to make improvements in your utility system. Rate
adjustments may be necessary in order to address these
improvements. The cost of
these improvements may be reflected in the rate structure.
Connection Charges, System Development Charges, and Minimums for New Services
Size Service
Connection Charges
Inside City Limits
Connection Charges
Outside City Limits
System Development
Charge (SDC)
Monthly
Minimum
3/4"
$250.00
Contact our office
$595.00
$10.50
1"
$325.00
Contact our office
$825.00
$17.42
1 1/2"
$400.00
Contact our office
$2,360.00
$32.68
2"
$450.00
Contact our office
$3,200.00
$52.29
3"
Actual Cost - including meter
Contact our office
$9,450.00
$217.86
4"
Actual Cost - including meter
Contact our office
$13,400.00
$435.70
6"
Actual Cost - including meter
Contact our office
SDC will be calculated
$871.42
8"
Actual Cost - including meter
Contact our office
SDC will be calculated
$1,742.86
Special Rates on 3/4" & 1" Sprinkler meters
To qualify for extra meter, Customer has to be paying "WASTEWATER" charges. Customer will not be billed wastewater charges on extra meter.
Size Service
Connection Charge
System Development Charge (SDC)
Monthly Minimum
3/4"
$150.00
$595.00 *
$10.50
1"
$225.00
$17.42
* Mub will not assess a SDC fee for the 3/4" meter that is connected to an existing tap (same connection point). However, if a customer wishes the connection in a different location or an increase in size, this will require an additional tap and will be assessed a SDC fee.
Schedule of Wastewater Rates Effective February 7, 2007
Residential, Commercial, & Industrial
Class
Residential :
12
First 2,000 gallons - Minimum
$10.80
All usage greater than 2,000 gal.
$5.40 per 1,000 gal
Commercial :
13
Monthly Charge
$10.80
All Usage
$5.40 per 1,000 gal.
Industrial :
14
Monthly Charge
$25.00
All Usage
$4.11 per 1,000 gal.
Industrial : not on MUB water
15
Monthly Charge
$25.00
All Usage
$4.11 per 1,000 gal.
Size Service
Connection Charge
System Development
Charge (SDC)
3/4"
$250.00
$1,003.00
1"
$250.00
$1,705.00
2"
$250.00
$6,720.00
3" & above - Contact our office at 256-878-3761
Special Charges
Should a customer currently paying wastewater charges desire an additional or "second" water meter for outside watering needs, the following charges will apply:
3/4" $ 150.00 connection charge
1" $ 225.00 connection charges
The above meter will be installed adjacent to the existing water meter and shall be connected to the existing tap or connection point. The intent of this connection will allow a customer a metering option for outside watering needs without wastewater charges. No additional water volume or pressure will be accomplished through this connection.
Should a customer desire an increase in volume, an increase in meter size, or desire the meter to be installed in a different location, all normal charges will be assessed.